ACTUALITE Aéronautique

Vous souhaitez réagir à ce message ? Créez un compte en quelques clics ou connectez-vous pour continuer.
ACTUALITE Aéronautique

ACTUALITE Aéronautique : Suivi et commentaire de l\'actualité aéronautique

Le Deal du moment :
SSD interne Crucial BX500 2,5″ SATA – 500 ...
Voir le deal
29.99 €

+17
patrick1956
VV
art_way
aubla
voodoo
aeroduO5
Frequent Traveller
macintosh
Vector
Paul
Ernest
jullienaline
Rasta'
alain57
bluesky
Poncho (Admin)
Beochien
21 participants

    Bombardier C-Séries (partie 1)


    Paul
    Whisky Quebec


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Paul Jeu 25 Oct 2012 - 11:37

    Bonjour,

    Non, Maximum cruise speed = 0,82 Mach

    Poncho (Admin)
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Poncho (Admin) Jeu 25 Oct 2012 - 14:11

    En attendant

    http://www.montrealgazette.com/business/Bombardier+CSeries+depth+look+where+things+stand/7417411/story.html


    Poncho (Admin)
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Poncho (Admin) Jeu 25 Oct 2012 - 14:14

    On voit un peu mieux l'usine et les composants pour les avions suivants par ci par là
    Des nez, des bulkheads...
    Beochien
    Beochien
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Beochien Mer 7 Nov 2012 - 12:10

    D'aprés le Cousin, sur AWEB !
    3-6 mois de retard pour le C-Séries ! Ce serait officiel :
    http://www.aeroweb-fr.net/forum/aviation-civile/1526/22

    Paris gagné ! Poncho! Wink

    JPRS
    Paul
    Paul
    Whisky Quebec


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Paul Mer 7 Nov 2012 - 12:13

    Copie du communiqué:

    Bombardier a publié aujourd'hui ses résultats financiers du troisième trimestre clos le 30 septembre 2012. Les revenus ont totalisé 4,3 milliards $, comparativement à 4,6 milliards $ pour la période correspondante de l'exercice précédent. Le résultat avant charges de financement, revenus de financement et impôts sur le résultat (RAII) a été de 248 millions $, comparativement à 301 millions $ l'exercice précédent. La marge RAII s'est chiffrée à 5,7 %, contre 6,5 % l'exercice précédent.

    Le résultat net du troisième trimestre clos le 30 septembre 2012 s'est établi à 212 millions $, en regard de 192 millions $ pour le trimestre correspondant de l'exercice précédent. Le résultat par action (RPA) dilué a été de 0,12 $, comparativement à un RPA dilué de 0,11 $ l'exercice précédent. L'utilisation des flux de trésorerie disponibles (flux de trésorerie liés aux activités opérationnelles, déduction faite des additions nettes d'immobilisations corporelles et incorporelles) a été de 237 millions $ pour le troisième trimestre clos le 30 septembre 2012, comparativement à une utilisation de 346 millions $ l'exercice précédent. Le niveau de liquidités de 3,5 milliards $ inclut 2,1 milliards $ de trésorerie et équivalents de trésorerie au 30 septembre 2012, en regard de respectivement 4,1 milliards $ et 3,4 milliards $ au 31 décembre 2011. Le carnet de commandes total a augmenté de 4,7 milliards $ depuis le début de l'année pour atteindre 58,6 milliards $ au 30 septembre 2012.

    "Chez Aéronautique, depuis le début de l'année, de solides progrès ont été enregistrés dans le programme de développement CSeries et les essais progressent bien, a déclaré Pierre Beaudoin, président et chef de la direction de Bombardier Inc. Nous avons tiré parti de l'élan de ces derniers mois pour franchir un certain nombre d'étapes clés; toutefois, certains aspects requièrent plus de temps. De concert avec nos fournisseurs, nous avons maintenant harmonisé tous nos engagements du calendrier du programme. Il en résulte que le vol inaugural de l'avion CS100 est maintenant prévu d'ici la fin juin 2013, un calendrier réalisable selon toutes les parties. Nous allons continuer de faire des mises à jour sur le programme régulièrement, avec une mise à jour plus détaillée au premier trimestre de l'an prochain.

    "Transport a bénéficié encore une fois ce trimestre de la grande étendue de son marché, enregistrant un bon niveau de nouvelles commandes couvrant l'ensemble de ses segments. Avec un ratio de nouvelles commandes sur revenus de 1,1 à ce jour, son carnet de commandes a atteint 32,5 milliards $ au 30 septembre 2012. Chez Aéronautique, les revenus pour le trimestre sont restés stables à 2,3 milliards $ avec un total de 57 avions livrés contre 68 l'an dernier. La demande pour nos produits est demeurée solide avec un total de 297 commandes fermes depuis le début de l'exercice contre 206 l'an dernier.

    "Malgré la faiblesse de l'économie, notre diversification sur le plan des produits et sur le plan géographique nous a permis de continuer de bâtir un carnet de commandes solide de 58,6 milliards $, tout en investissant dans nos nouvelles plateformes et en maintenant la stabilité de nos résultats. Les années à venir s'annoncent passionnantes alors que nous commencerons à voir nos produits prendre vie", a conclu M. Beaudoin.

    Le programme de développement d'avions CSeries enregistre de solides progrès. La fabrication du banc d'essai statique de cellule complète (CAST) et celle de l'avion destiné au premier vol progressent bien. Les résultats du banc d'essai et de certification intégré des systèmes au sol (CIASTA / avion 0) sont tels que prévu. Plusieurs étapes clés ont déjà été franchies mais, à ce point-ci du programme, le groupe Aéronautique rencontre des difficultés, principalement reliées à certains fournisseurs. Il en résulte que le vol inaugural aura lieu d'ici la fin juin 2013 et l'entrée en service de l'avion CS100 devrait avoir lieu environ un an après le vol inaugural.

    Le calendrier pour l'avion CS300, sur lequel porte une partie importante des commandes et engagements des programmes CSeries, demeure inchangé, et l'entrée en service est prévue pour la fin 2014.


    Bombardier Aéronautique

    Les revenus de Bombardier Aéronautique ont totalisé 2,3 milliards $, un montant similaire à celui de l'exercice précédent. Le RAII s'est établi à 123 millions $, se traduisant en une marge RAII de 5,4 % pour le troisième trimestre clos le 30 septembre 2012, en regard à 129 millions $, ou 5,6 %, l'exercice précédent. L'utilisation des flux de trésorerie disponibles a totalisé 68 millions $, comparativement à des flux de trésorerie disponibles de 53 millions $ pour le trimestre correspondant de l'exercice précédent.

    Cinquante-sept avions ont été livrés au cours du troisième trimestre clos le 30 septembre 2012, comparativement à 68 au cours du trimestre correspondant de l'exercice précédent. Le carnet de commandes de Bombardier Aéronautique a augmenté de 18,6 % pour s'établir à 26,1 milliards $ au 30 septembre 2012, en regard de 22,0 milliards $ au 31 décembre 2011.

    Bombardier Avions d'affaires a connu un volume robuste de nouvelles commandes, enregistrant 45 commandes nettes, en regard de 30 au cours du trimestre correspondant de l'exercice précédent. Cela inclut trois commandes fermes de plusieurs avions pour un total de 19 appareils de la gamme d'avions Global, d'une valeur de 1,2 milliard $, selon les prix affichés.

    Bombardier Avions commerciaux a reçu 38 commandes fermes au cours du troisième trimestre clos le 30 septembre 2012, dont la conversion de la commande conditionnelle de WestJet portant sur 20 biturbopropulseurs Q400 NextGen en une commande ferme d'une valeur de 683 millions $, selon les prix affichés. Est également incluse dans le carnet de commandes la conversion en commande ferme de six biréacteurs régionaux CRJ900 NextGen et 12 biturbopropulseurs Q400 NextGen. La valeur de ces commmandes fermes totalise 643 millions $.
    Beochien
    Beochien
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Beochien Mer 7 Nov 2012 - 12:15

    Merci Paul !
    C'est la journée des résultats Trimestriels attendue, bien vu !
    C'est bien que le C-300 n'ait pas bougé !
    Poncho (Admin)
    Poncho (Admin)
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Poncho (Admin) Mer 7 Nov 2012 - 12:31

    Merci Paul, merci Beochien

    Bon c'est qui le fournisseur fautif ? les stabs ?

    Ils annoncent max 6 mois de retard à ce stade, c'était effectivement attendu... on ne sait tjs pas qui de l'a350 ou du Cseries volera en premier... Wink

    J'attends un peu plus de détails quand même


    _________________
    @avia.poncho
    Beochien
    Beochien
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Beochien Jeu 8 Nov 2012 - 8:29

    FlightGlobal y va de son commentaire !
    Rien de bien nouveau , Juin 2013, pour eux !

    http://www.flightglobal.com/news/articles/supplier-issues-delay-cseries-first-flight-to-2013-378644/

    Supplier issues delay CSeries first flight to 2013

    By: Dominic Perry London

    Bombardier has delayed the first flight and entry-into-service of its in-development CSeries narrowbody, with the maiden sortie now expected to take place by the end of June 2013 and handover to its launch customer following around a year later.
    Poncho (Admin)
    Poncho (Admin)
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Poncho (Admin) Jeu 8 Nov 2012 - 9:32

    Oui pas de détail

    Etonnant


    _________________
    @avia.poncho
    Poncho (Admin)
    Poncho (Admin)
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Poncho (Admin) Jeu 8 Nov 2012 - 12:08

    Bon c'est le mieux qu'on puisse trouver sur le web à ce moment

    http://leehamnews.wordpress.com/2012/11/07/bombardier-announces-delay-in-cseries-first-flight/#comments


    We’ve made substantial progress. First flight will be by end of June 2013 with EIS for CS100 a year later. CS300 timeline still EIS YE2014.
    BBD did not identify “major systems” that are taking longer to arrive for assembly. Delay won’t have an impact on cash assumptions of the business plan; contingency was already figured in.
    What comfort can you give us June target is achievable? Answer: We’ve been working with customers with transparency and consideration that early delivery positions could have some variation. It was important for us to maintain a target date to get all suppliers a harmonized delivery schedule. It made no sense at all to give them a break. We feel the harmonized schedule is now the end of June. There is now a commitment by the suppliers, you see the aircraft coming together.
    There will be some individual discussions for penalties from some suppliers.
    The fear is that four or five months out will see another delay? Answer: There’s a lot of things that can happen, but we are more at execution phase. We know where the suppliers are at. We have more visibility than at design stage. Assembly of the parts we’ve done so far are extremely well. We are testing some versions of the software and when we go to flight we’ll have the latest version. We have more visibility now.
    Potential customers are most impressed with the amount of testing we are doing up front.
    There is no delay on the engine; it will be certified by the end of this year.
    BBD was asked specifically if fly-by-wire was the reason for the delay. Answer: It is the most challenging.
    Complete static testing expected in April.
    Don’t anticipate much in the way of penalties for customers.
    160-Seat CS300 is a customer option. It’s a question of seating density; it’s not another model.
    There are 55 Tier 1 suppliers and more than 300 more. Software is a big part of the challenge we have and software is everywhere in a product like this

    A priori c'est un retard "général" pas un composant réellement plus à la bourre qu'un autre... juste le glissement général du planning. C'est presque rassurant, ça veut dire qu'ils ont un paquet de pièces sous la fin

    Le GTF sera certifié cette année
    Les commandes de vol sont un sujet de préoccupation
    Les essais statiques seront finis en avril, date à laquelle airbus commencera les siens (pour fixer les choses)
    LE CS300 160 places est une option (donc elle est sur la table si je comprends bien)

    Est ce que j'ai bien compris ?




    _________________
    @avia.poncho
    Beochien
    Beochien
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Beochien Jeu 8 Nov 2012 - 12:20

    Salut Poncho !
    Tu crois que le A350 commencera ses essais statiques en avril (Sur MSN 5000 je suppose ??)
    Et pour les Ailes en Allemagne ??
    Pour faire voler MSN001 peut être en Juin ??
    Je vois,le MSN 5000, complet d'ici la fin d'année !
    Optimiste... Hum ??
    Poncho (Admin)
    Poncho (Admin)
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Poncho (Admin) Jeu 8 Nov 2012 - 14:20

    C'est dans la com d'airbus, les essais statiques sur MSN5000 débutent en avril il me semble


    _________________
    @avia.poncho
    Poncho (Admin)
    Poncho (Admin)
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Poncho (Admin) Mar 13 Nov 2012 - 9:40

    Des détails sur les déboires de BBd

    http://www.ainonline.com/aviation-news/ain-air-transport-perspective/2012-11-12/bombardier-out-sequence-parts-arrivals-lead-cseries-delay


    Delayed delivery of certain critical components leading to a need to “reharmonize” integration tasks has forced Bombardier to delay first flight of its new CSeries CS100 until at least the end of next June, roughly six months later than the most recent target. If all goes according to the latest plans, the smaller of the two-variant narrowbody series will consequently enter service in the middle of 2014.

    The timeline for the larger of the pair–the CS300–remains unchanged, added Bombardier, meaning it still expects that airplane to enter service by the end of 2014.

    “Since the beginning of the year, substantial headway has been made in the CSeries development program and testing is progressing well,” said Bombardier president and CEO Pierre Beaudoin in a statement issued last week. “We have used the momentum gained over the last few months to meet a number of key milestones; however, some areas require more time. Together with our suppliers, we have now fully harmonized all commitments to the program’s schedule. Therefore, the CS100’s first flight will now occur by the end of June 2013–a timeline that all parties have agreed is achievable.”

    Speaking during last week’s third-quarter earnings call, Beaudoin pointed to the complexity of many of the CSeries’ systems–foremost among them the airplane’s fly-by-wire system–as another contributor to its failure to meet the December first-flight goal. Still, he expressed satisfaction with the “substantial headway” made during the last year and what he called momentum gained by suppliers after their failure to deliver parts on time led to a sequencing “challenge.” He wouldn’t identify any of the CSeries’ some 55 Tier 1 suppliers and 300 sub-tier suppliers as a culprit, however, and, in fact, acknowledged that delays by Bombardier in delivering design drawings led to some of the delays.

    Consequently, Beaudoin downplayed the potential for any penalties Bombardier might impose. Similarly, he as much as dismissed the consequences of any penalties Bombardier might have to pay to its customers, emphasizing his company’s complete transparency and conservative approach to delivery guarantees.

    In terms of cost to the program, the delay will not result in an expenditure that deviates from the original business plan, which, said Beaudoin, contained contingencies for such an event.

    Still holding firm orders for 138 CSeries jets, Bombardier has collected letters of intent, options and commitments accounting for another 352 airplanes.

    ah ben non pas plus de détail (sauf dans le titre en fait)


    _________________
    @avia.poncho
    aeroduO5
    aeroduO5
    Whisky Quebec


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par aeroduO5 Mar 13 Nov 2012 - 18:45

    En fait on ne sait pas trop si c'est vraiment lié à des composants ou si c'est plus général.

    Il se pourrait qu'en fait BBD veuille se donner du temps.



    Ceci dit retarder le CS100 sans bouger le CS300 me paraît ambitieux.

    On verra bien.
    Beochien
    Beochien
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Beochien Mar 13 Nov 2012 - 19:15

    Visiblement il ne faut pas trop compter sur de la clarté chez Bombardier !
    Pour l'instant du moins, c'est leur politique !
    Faut faire avec ... en évitant l'angélisme !
    Poncho (Admin)
    Poncho (Admin)
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Poncho (Admin) Mar 13 Nov 2012 - 22:27

    S'ils pensent ne pas décaler e cs300 c'est qu'ils ne doivent effectivement pas avoir de pb de poids ou de conso.
    Donc pas de besoin de faire des batchs....
    Peut être que je me trompe.....


    _________________
    @avia.poncho
    Beochien
    Beochien
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Beochien Mar 13 Nov 2012 - 22:35

    Ce n'est pas se tromper où pas ! Mad

    On est devant des adeptes de la méthode "Coué" chez Bombardier !
    Les analystes ont 6 mois d'avance sur leurs déclarations, et ne se trompent pas trop ...
    Donc rien à attendre où à espérer côté info chez Bombardier, langue de bois garantie jusqu'à la preuve du contraire !
    Sauf quand la maison tombe sur le chien !

    Faut faire avec ! pale

    JPRS
    Poncho (Admin)
    Poncho (Admin)
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Poncho (Admin) Jeu 15 Nov 2012 - 10:56

    Ben hier, les officiels ont quand même laissé penser que le retard de +6 mois annoncé pourrait ne pas être consommé

    http://uk.reuters.com/article/2012/11/14/uk-china-airshow-bombardier-idUKLNE8AD01920121114


    "I think we are going to fly soon after the
    new year: not the 2nd (of January), but early next year," Chet Fuller,
    senior vice president for Bombardier Commercial Aircraft, said.
    Announcing
    the delay from a previous goal of end-2012, the plane and train maker
    had blamed unspecified supplier delays for disruption to its biggest
    plane project.
    Fuller said the
    problem was mainly linked to a single supplier that he declined to
    identify, although he hinted when answering questions that it could
    involve the complex process of preparing the jet's advanced digital
    systems for certification.
    He
    dismissed industry speculation that the problem was linked to
    Bombardier's suppliers in China, where the Canadian firm extended a marketing agreement with state-owned COMAC at this week's international air show in Zhuhai, near Hong Kong.
    He broadly exonerated a production plant in Northern Ireland that is responsible for the plane's carbon-composite wings.
    "There is some schedule pressure there on the wing. A while back there was some schedule pressure in other areas," he said.
    "At
    this point of any programme, something is always competing for first
    place (on delays). Right now, it is one particular supplier who is
    solidly in the lead," he added.
    Analysts
    say that with the latest delay, Bombardier faces an even tougher sales
    job. Orders for the jet, which is priced significantly cheaper than its
    rivals' planes, have slowed with just five so far this year. In total,
    it has only 138 firm orders.
    COMPETITION FOR RESOURCES
    Fuller
    said the C-Series would break new ground in digital architecture and
    that this posed particular problems in getting ready for safety
    certification, given the "reams" of paperwork required to log each line
    of software for inspectors.
    "These
    airplanes are now controlled by hundreds of millions of lines of code
    -- and not simple lines of code. Just when you think you couldn't
    possibly have a simultaneous and multiple failure someone proves you
    can," Fuller said.
    "The
    certification authorities really have no interest in programme
    performance and every interest in safety. For the flying public that is a
    good thing, but it does make programme performance a challenge."
    The
    problem of applying a decades-old airworthiness process to the digital
    revolution now sweeping through plane design contributed to a four-year
    delay to Europe's A400M military airlifter, as engineers struggled to
    track engine software.
    So
    far, the C-Series delays are nowhere near as serious as for the Airbus
    military airlifter or Boeing's 787 Dreamliner, which entered service
    three years late, but analysts say sales of the aircraft could remain
    subdued until its first flight.
    Bombardier
    expects deliveries of the 110-seat CS110 version of the C-Series to
    start in mid-2014. The entry into service for Bombardier's 130-seat
    CS300 is still seen at the end of 2014.
    Although it is new, Bombardier's $3.4 billion plane project faces problems shared by many aircraft manufacturers.
    A
    global supply base is trying to cope with production increases in most
    major civil programmes and some military ones like America's F-35
    fighter just when credit remains scarce.
    "Everyone
    is competing for resources, for capability, for intellect, for
    attention. So you have got to keep the pressure on constantly and
    somehow make sure you get truth data out of all your suppliers," said
    Fuller in an interview.
    "You have got to treat them like partners because yelling at people doesn't do any good or make people move faster."
    Bombardier does however have to deal with one requirement yet to be tackled by its competitors, according to Fuller.
    On
    Christmas Day 2009, a bomb hidden in the underwear of Umar Farouk
    Abdulmutallab caused a fire but failed to explode on a Delta Airlines flight carrying 289 people.
    That
    led to what Fuller described as the 'underwear bomber rule', forcing
    designers of new aircraft to prove the fuselage could withstand a
    limited amount of damage without crashing.
    "So
    now you have to route things like hydraulics and electrical and fuel
    systems down both sides of the airplane. That is how a fighter is
    designed for battle damage," said Fuller, a 51-year-old former U.S. Navy
    pilot.
    "The C-Series is the first
    airplane to have to comply with it, as will every other airplane in the
    future. So now someone has to determine sufficient tests. It is a
    complex business and keeping it ... all on schedule is very challenging." (Editing by Jeremy Laurence)



    On cherche le responsable des retards :

    - Les italiens pour la queue ? on n'a pas vu passer de photos de la queue
    - Les commandes de vol électriques ?

    en tout cas pas les chinois

    http://www.aviationweek.com/Article.aspx?id=/article-xml/avd_11_14_2012_p01-02-516390.xml


    _________________
    @avia.poncho
    Beochien
    Beochien
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Beochien Jeu 15 Nov 2012 - 11:47

    Mouais...
    Bombardier aurait tout réorganisé la prod Chinoise à travers Belfast, en plus, et sans retard ...
    Bon ... moi je veux, bien, et pour un ou 2 protos, des miracles à Belfast, pourquoi pas !
    Mais j'ai quand même l'impression que Bombardier joue une très grosse partie avec la Chine,(Peut être la distribution "Occidentale" du Comac 919 ), et ne dira rien qui puisse déplaire !
    Bon, maintenant, ils vont prendre de l'avance dans le retard, tant mieux, on a rarement vu cela, menfin !

    Bien d'accord, que les Italiens ont été plus que discrets, pour ce qui est de la queue,
    pas encore une photo en sortie d'atelier ?? hum !

    JPRS
    aeroduO5
    aeroduO5
    Whisky Quebec


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par aeroduO5 Jeu 15 Nov 2012 - 17:46

    C'est certain que les chinois n'ont pas retardé les proto, puisque leur travail a été fait à Belfast.

    Il est possible par contre qu'ils puissent retarder les avions au delà des premiers exemplaires.



    Pour la queue et les Italiens, c'est probable, vu qu'on a rien vu.

    Pour les commandes de vol, c'est possible aussi vu que c'est nouveau pour BBD.
    Beochien
    Beochien
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Beochien Jeu 15 Nov 2012 - 18:00

    Les cdes de vol , hum !

    De mémoire,

    Ils on déjà des Bizz Jet avec, chez Bombardier, mais pas les mêmes cdes électriques, certainement !

    Pour les Chinois, ils ont quand même bossé un peu, mais pas assez, Belfast a dû reprendre les protos avec des éléments Chinois, quand même, et peut être un peu avancés ...
    De ce que j'ai compris !

    Bon, la remise en ordre, on peut espérer qu'elle soit plus tranquille que celle de Boeing, il y a moins de cdes urgentes ... et moins d'appareils en cours tongue

    JPRS
    Beochien
    Beochien
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Beochien Dim 18 Nov 2012 - 22:20

    Bonsoir !

    De Aviation Week , Shenyang Aircraft, N'y serait pour rien dans les retards du C-Séries!
    C'est bien, à part cela, Bombardier, ils signent de très importants accords avec Comac en Chine cette semaine, qui peuvent inclure la diffusion du C-919 !

    Alors ... on a le droit d'y croire ... ou pas trop ! clown !

    -------------- De Aviation Week, le lien ----------

    http://www.aviationweek.com/Article.aspx?id=/article-xml/avd_11_14_2012_p01-02-516390.xml
    Poncho (Admin)
    Poncho (Admin)
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Poncho (Admin) Sam 24 Nov 2012 - 0:03

    Bonsoir
    http://www.aviationweek.com/Article.aspx?id=/article-xml/awx_11_23_2012_p0-520457.xml

    Trop petit pour Air Asia, qui ne le prendra pas.

    Cela dit, Air Asia semble avoir des petits soucis de licence d'opérateur

    http://chiongtheskies.blogspot.fr/2012/11/malaysian-regulators-find-issues-in.html


    _________________
    @avia.poncho
    Poncho (Admin)
    Poncho (Admin)
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Poncho (Admin) Ven 30 Nov 2012 - 22:57

    C'est parti pour le CS300 avec confirmation de la version 160PAX

    http://www.flightglobal.com/news/articles/bombardier-moves-cs300-into-detailed-design-with-high-density-variant-included-379612/


    Bombardier
    is moving into the detailed design phase on the larger CSeries variant
    with plans for a high-density version intact despite a rejection by a
    potential launch customer.
    AirAsia earlier today selected the Airbus A320neo instead of a 160-seat version of the normally 130- to 145-seat CS300, the larger sister to the 110- to 130-seat CS100.
    But
    Bombardier says it remains "optimistic" about the high-density product,
    and its specifications are being refined as the CS300 programme
    transitions from the joint definition phase into the detailed design
    phase in the company's internal development process.
    The
    high-density configuration is achieved without the need for additional
    fuselage plugs. "It's not another stretch," Bombardier says. The extra
    seating could require certain design changes, such as additional exit
    doors, to meet airworthiness regulations, the company adds.
    Other
    potential CSeries buyers continue to discuss the 160-seat option with
    Bombardier, the company says, adding that AirAsia remains a potential
    sales target as well.
    "AirAsia continues to be a customer who we look forward to doing business with," Bombardier says.
    The baseline version of the CS300 is expected to follow the CS100 into service about a year later.
    Bombardier
    still expects the CS100 to enter service in June 2014, a delay of about
    six months from the original schedule revealed in early November.
    The CS100 moved from the joint definition phase into detailed design in July 2010.
    Bombardier expects detailed design of the CS300 to be completed more rapidly because it is not a new aircraft but a derivative.




    C'est la detailed conception phase
    Des news du CS100 ?


    _________________
    @avia.poncho
    Poncho (Admin)
    Poncho (Admin)
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Poncho (Admin) Mer 5 Déc 2012 - 10:33

    Bon on a vu l'A350 avec le gros du mécano complet
    On attend le Cseries

    Sur Airliner il se dit
    Ailes montée la semaine prochaine
    On verra donc
    http://www.airliners.net/aviation-forums/general_aviation/read.main/5626680/#12


    _________________
    @avia.poncho
    Poncho (Admin)
    Poncho (Admin)
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Poncho (Admin) Lun 10 Déc 2012 - 9:48

    Bonjour

    vu sur Twitter


    Stefan Paetow MCIJ
    ‏@stefanpaetow





    @AvWeekRupa @APEXjon @APEXmary @jonostrower Second set of Bombardier C-Series wings leaving BFS tomorrow AM on Antonov An124 :-)


    + Certif du PW1500G reportée début 2013 ce qui est finalement logique


    _________________
    @avia.poncho
    Poncho (Admin)
    Poncho (Admin)
    Whisky Charlie


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Poncho (Admin) Mar 18 Déc 2012 - 10:41

    Vu passé ça

    Etonnant non ?

    http://blogs.crikey.com.au/planetalking/2012/12/17/cathay-pacific-and-the-cseries/

    Bombardier C-Séries (partie 1) - Page 18 DSC_01601 à Zhuhai Air show cette année


    _________________
    @avia.poncho
    aeroduO5
    aeroduO5
    Whisky Quebec


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par aeroduO5 Mer 19 Déc 2012 - 18:33

    Oui étonnant

    Cathay n'a pas de moyens-courriers.

    Dragonair à la limite, mais Cathay j'y crois pas.

    Contenu sponsorisé


    Bombardier C-Séries (partie 1) - Page 18 Empty Re: Bombardier C-Séries (partie 1)

    Message par Contenu sponsorisé


      La date/heure actuelle est Sam 23 Nov 2024 - 0:05